I have a project to automate four generator sets. The system will monitor and store the load demand of the factory. Once there's Power outage, the PLC should send signal to the generator set with the capability to power the load stored before the outage to start. Also, when the load demand increases/decreases the PLC should send signal to the appropriate generator set to start and turn off the other generator set.